March 16, 2011 |

We have pews! |

We have pews! |

Altar and Ambo unwrapped |

Altar and Ambo unwrapped |
|
March 11, 2011 |

Painting in progress |

Painting in progress |

Railing behind the Baptismal Font |

Railing and Baptismal Font |

Sacristy after repainting |

Temporary Stations of the Cross in the Commons |
|
February 25, 2011 |

View from the Sacristy Door |

Back of the sanctuary |

Covering the conduit above the altar |

New theater lights installed and wall repaired |

View from above the altar |

Altar from above |

View into the attic above the sanctuary |

View into the attic above the sanctuary |

View down the new steeple ladder |

Ladder in into the steeple |
|
January 19, 2011 |

Refurbished Barrel Light (covered) and new altar
lights |

Close up of new altar lights |

Inside of the refurbished barrel lights |

Altar lights |

Wiring in place for the new audio and video panels |

Termite damage near the Clay Street entrance |

Mosaic tile on floor at the 7th Street entrance |

Under the replaced floor
click here to see what
it looked like before |

Crawl space with ground cover and new cable runs
click here to see what
it looked like before |

Crawl space with ground cover and new cable runs
click here to see what
it looked like before |

New floor beam and joists
click here to see what
it looked like before |

Boiler Room |

Control panel for the organ located in the boiler
room |

Control panel for the lights located in the boiler
room |

New conduit runs in the boiler room |

Old brick wall in the boiler room |

Looking into the crawl space from the entrance to the
boiler room |

Boiler Room |
|
December 29, 2010 |

Oak floor is being installed.
(taken from in front of the altar) |

Oak floor in place on the 7th Street side
(taken from organ location) |

Progress on the floor continues
(taken from organ location) |

Flooring waiting to be installed. |

Left side, temporary wall in front of the altar has
been removed.
(taken from the baptismal font) |

Right side, temporary wall in front of the altar has
been removed.
(taken from the baptismal font) |
|
December 8, 2010 |

Subfloor is in, layout for the wood floor is starting!
(taken from the doorway to the Commons) |

Layout for the wood floor is starting!
(taken from baptismal font area) |

Fr. Rush showing Parish members how to clean up their
act. |

Subfloor is in, layout for the wood floor is starting! |
|
November 19, 2010 |

New joists are in! |

New joists are in! |

New joists overlapped over a new steel beam |

New joists and one of the old ones |

Damage in one of the beams removed from the church |

Three beam sections stored on the 7th street side of
the church |

New joists in place |

Cross bracing being installed between the new joists |
|
November 5, 2010 |

The stone piers have been covered with concrete. |

The piers are ready for steel to be set. |
|
October 22, 2010 |

Blue area indicates where the floor has been removed |

Corner near 7th Street Entrance |

Corner near the 7th Street Entrance |

Corner near door to the Commons |

Ledge on the wall to support the joists |

Entrance to the Choir Room on left |

Corner at 7th Street Entrance |

Original stone piers for the beams |
|
October 8, 2010 |

Blue area indicates where the floor has been removed |

Section of floor and joists removed exposing the
support for one of the original side altars |

Northwest corner of the sanctuary with the floor and
joists removed |

Joists exposed in the back center of the sanctuary |

Original Side Altar support |

Center joists visible and east floor removed. |

View into the boiler room |

View into the boiler room with new wall in place. |

New boiler room wall. |

Center joists exposed and removed east floor. |
|
October 1, 2010 |

Blue area indicates where the floor has been removed |

This joist collapsed when a worker stepped on it. |

Floor removed on the east side of Sanctuary |

Stone pillar near the boiler room. |

Damaged joists and beam. |

Damage joists and beams. |

View into the boiler room. |
|
September 9, 2010 |

Plastic installed to control dust |

Section of the floor that was
removed |

Damaged joist |

Damaged joists |

Removed section of the floor |

Removed section of the floor |

Altar and ambo protected from
damage |

Access to the attic |